Current Project List - Under Construction
- W 10th St Street & Drainage 01-19-ST-023 10
- W 13th Street 100% Plans Bid Set
- 24th and 25th Sidewalks 100% PLAN SET Bid Set
- W. 24th St. Valmar St. to Valentine St. 01-17-ST-41 100% Drawings Bid Set
- West 30th Street 06-22-ST-211 100% Plan Drawings-R3
- W 35th Street 100% plans
- W 41st St 07-18-DR-241 100% Plans
- 57th Street Drainage Plans Bid Set
- Adell Dr Drainage 100% Plans Bid Set
- AUTUMN ROAD WIDENING 04-22-ST-2DR 100% PLAN DRAWINGS 08.28.2024 Bid Set
- Bowman - Kanis AS BID PLANS_P1 061693
- Bowman - Kanis AS BID PLANS_P2 061693
- Bridgeport 100% Plans
- Broadway Draiange 01-22-DR-181 100% Plan Drawings Bid Set
- Boyd St 100% plans
- Chenal Club Signal 100% Plans Bid Set
- Chenal At Fitzroy Drainage 05-22-DR37 100% Plan Drawings
- Chenal Parkway at Loyola Right Turn Lane 100% plans Bid Set
- Cherrybark Drive Drainage plans Bid Plans
- CHERRYWOOD COURT DRAINAGE 100% PLANS Bid Set
- DAVID O DODD 100% PLANS
- Dorchester Dr Drainage 100% Plans Bid Set
- Durwood Rd Drainage 100% Drawings Bid Set
- F Street Reconstruction 03-18-ST-56_100% Plans
- HIDDEN VALLEY DRIVE - DRAINAGE 04-22-DR-18-100% PLANS
- Irish Rose 100% Drawing Plans
- JOHNSON RANCH CULVERT REPLACEMENT 05-22-DR-004B 100% PLAN DRAWINGS
- Kavanaugh Drainage near 5201 100%
- Kavanaugh at N University Ave Drainage 03-22-037 100% Plan Drawings
- Kirk at Rahling 100% Plans Bid Plans
- L STREET DRAINAGE 100% Bid Set
- LARCH ROAD DRAINAGE Bid Set
- LAMARCHE DR-LUCKY LN CROSSWALKS 100% PLANS Bid Set
- LANDFILL TRUCK WAS PLANS
- Leander at Kanis Combined Bid Set
- MELLON AT H 100%
- North Rodney Parham Plan Sheets
- North Rodney Parham Plan Sheets_CLEAN
- North Rodney Parham 9-20-21 FOR CONSTRUCTION REDUCED
- Pine Summit Court Drainage ADDENDUM 1 Bid Set Plans
- Polk St (Lee to F St) 03-18-ST-211 100% Plans
- PRESTON DRIVE AREA IMPROVEMENTS 07-22-DR-214 100% PLAN DRAWINGS Bid Set
- R St at Fillmore St Drainage 03-22-DR-07 100% Plan Drawings revised 6-10-2024
- Redwood Drive Drainage 100% Plans Bid Set
- RESERVOIR RD at CLAREMORE ST DRAINAGE 04-22-DR-001 100% PLAN DRAWINGS
- RESERVOIR ROAD WIDENING 100% Bid Set
- Rinke road drainage 100% Bid Set
- Shackleford Breckenridge Sidewalk Repair 100% PLANS
- Southeast Trail 100% Phase 1
- Swaggerty Drainage Plans - As Bid
- Valley Drive Drainage 100% Plans Bid Set
- Walker St Drainage 06-22-DR-157 100% Plan Drawings
- Ward 2 Sidewalks Combined 100% Plan Set Bid Set
- Windsor Drive Drainage 100% Bid Set
- Woodson Road Reconstruction 100% Plan Drawings Bid Set
- Zion Square - Full Set Plan-R6