Current Project List - Design 90%
- 4th and Plateau Drainage 90% Plans
- 061757 Jonesboro Drive Childrens Trail (Little Rock) (S) - 90% Plan Set Part 1
- 061757 Jonesboro Drive Childrens Trail (Little Rock) (S) - 90% Plan Set Part 2
- Arthur Lane Reconstruction 06-18-ST-B104 90% Plan Submittal
- Chenal and Gamble 90% Signal Plans
- Gill Street at N. Cantrell Ped Bridge 90%
- Larch Road Drainage 02-22-DR-05_90% Plans Resubmittal_2024 10 15
- Morrison Court Drainage 05-17-DR-208A - 90% Plan Submittal
- Pine Summit Court Drainage C503 - Detention Plan (Reduced Volume) (002)90%
- Rinke Site (AR North) 90% plans
- Shackleford Drainage 90% PLANS
- Valley Drive Drainage Improvements 02 20 ST 171 90% Plan Drawings