Current Project List - Design 60%
- W. 24th St. Valmar St. to Valentine St. 01-17-ST-41 60% Drawings
- E 39th St Drainage Park to Riddick 60% Plans
- Arkansas_River_Trail_Rev_60_percentA
- Broadway Drainage 01-22-DR-181 60% Plan Drawings
- Chenal Parkway at Chenal Club Signal 60% Plans
- Kanis Road and Cooper Orbit Improvements 00-22-TR-146 60% Plans
- Kirk at Wellington 60% Submittal
- Montrose and Longlea 60%
- PRESTON DRIVE AREA IMPROVEMENTS 07-22-DR-214 60% PLAN DRAWINGS
- River Trail Connector 60%
- Rock & 6th Street Intersection Improvements 60%
- S Shackleford at col glenn intersection 07-19-TS-232 60% Plans - HALF SIZE
- TAYLOR LOOP CREEK DRAINAGE 05-22-DR-36 60% PLANS
- Vimy Ridge Rd Plans 60%
- Ward 1, 3 & 7 Sidewalks - 60% Plan Drawings
- Ward 4 Sidewalks GREEN MNT 60% SHEETSET